1 |
National Collaborating Centre (NCC) – Consultancy Services to Prepare the National EST Strategy for the Philippines |
UP-NCTS for UNCRD (through UPNCTSFI) |
August 2008 –May 2011 |
2 |
Development of Mega Manila Public Transportation Planning Support System (MMPTPSS) |
UP-NCTS for the Department of Transportation and Communications (through DOTC-UPD G-to-G Project MOA) |
June 2009 – June 2012 |
3 |
On-Road and Vehicle Testing of Hydrous Ethanol (hE10) Fuel in the Philippines |
UPNCTSFI for Argos North Sea Group (through UPNCTSFI) |
February – September 2012 |
4 |
Traffic and Transport Surveys for the Metro Manila BRT Feasibility Study |
UPNCTSFI for Integrated Transport Planning (ITP) Ltd. (through UPNCTSFI) |
October 2012 |
5 |
Pre-Feasibility Study and Concept Plan for the Botocan Transport System (BTS) |
UPNCTSFI for MPTC and MIESCOR (through UPNCTSFI) |
September 2012 – August 2013 |
6 |
Alternative Fuels Vehicle Tests and Research Program and Energy Efficiency in Road Transport [On-road Tests Component] |
UP-NEC with UP-NCTS for the DOE Energy Utilization Management Bureau (through DOE-UPD G-to-G Project MOA) |
August 2012 – December 2013 |
7 |
Evaluation of the Re-introduction of Traffic Signal Control at the Intersection of the University Avenue and Commonwealth Avenue |
SOS (Source of Solutions) Special Grants, UPD-OVCRD |
January 2012 – February 2014 |
8 |
On-Road and Vehicle Test of 5% Coco-Methyl (CME) Biodiesel Blend (B5) in Public Transport |
UP-NCTS for the Philippine Coconut Authority (through PCA-UPD G-to-G Project MOA) |
June 2013 – December 2014 |
9 |
Transportation and Traffic Surveys for the Preparatory Survey on Metro Manila Central Business Districts Transit System Project in the Republic of Philippines |
UPNCTSFI for ALMEC Corporation (through UPNCTSFI) |
March – June 2014 |
10 |
Study of Three (3) Potential Automated Guide-way Transit (AGT) System Routes |
UP-NCTS for the Metals Industry Research and Development Center (through DOST-MIRDC-UPD G-to-G Project MOA) |
February 2014 – November 2015 |
11 |
Project Preparation Phase for the Promotion of Low Carbon Urban Transport Systems in the Philippines |
UP-NCTS for UNDP (through UPNCTSFI) |
June 2014 – March 2015 |
12 |
Feasibility Study for Clark Transit Bus System |
UP-NCTS for the Bases Conversion and Development Authority (through BCDA-UPD G-to-G Project MOA) |
February – November 2015 |
13 |
Development of the Philippine Metropolitan Advanced Traveler Information System (PhilMATIS) |
UP-NCTS, UPD-EEEI and UPD-DCS for DOST-PCIEERD |
February 2012 – February 2016 |
14 |
Development of a
Customized
Local Traffic Simulator
(LocalSim) |
UP NCTS and UP DCS for DOST-PCIEERD |
April 2014 –
September
2016 |
15 |
Alternative Fuels Vehicle Tests and Research Program and Energy Efficiency in Road Transport (Phase 2) [On-Road Tests Component] |
UP-NEC for the DOE Energy Utilization Management Bureau (through DOE-UPD G-to-G Project MOA) |
March 2015 – October 2016; May 2017 |
16 |
Writeshop for the Local Public Transport Route Plan (LPTRP) Manual [in collaboration with TSSP and other universities] |
UP-NCTS for the Department of Transportation (DOTr) – Office of the Undersecretary for Road Transportation and Infrastructure |
March – April 2017 |
17 |
Emission Factors Development (EFD) Proposal |
UP-NCTS for the Environmentally Sustainable Initiatives Transportation Unit (DOTr-ESITU) |
2015 – 2018 |
18 |
Development of a
Customized
Local Traffic Simulator
(LocalSim) Phase 2 |
UP NCTS and UP DCS for DOST-PCIEERD |
April 2017 –
September
2018 |
19 |
Transportation and Traffic Management Plan Study for the City of Tacloban |
UP-NCTS for Tacloban City Government (through UPNCTSFI) |
October 2017 – February 2018 |
20 |
Cyber-Physical
Transportation Systems
(CPTS) |
UP NCTS, UP DCS and UP EEEI for DOST-PCIEERD |
October 2017 –
September
2019 |
21 |
Maritime Transportation
Information System
(MARIS) |
UP NCTS and UP DCS for DOST-PCIEERD |
January 2019 –
December 2020 |
22 |
Data Strengthening for Child Road Traffic Injury Prevention (CRTIP) Programme in the Philippines |
UP-NCTS for UNICEF (through UPNCTSFI) |
April 2019 – March 2020 |
23 |
Transportation and Traffic Management Plan Study for the Municipality of Dinalupihan |
UP-NCTS for the Municipality of Dinalupihan (through UPNCTSFI) |
March 2019 – July 2020 |
24 |
Engineering the Jeepney Using an OEM Vehicle Platform |
UP-NCTS/UP-VRTL for DOST-PCIEERD and DOE-EUMB |
April 2017 – December 2021 |
25 |
Modelling and Estimation of Transportation Energy Demand of the Philippines |
UP-NCTS for UP-OVPAA Energy Research Fund (ERF) |
October 2019 – February 2021 |
26 |
Comprehensive Transport and Traffic Management Plan for Zamboanga City |
UP-NCTS for the City Government of Zamboanga (through UPNCTSFI) |
December 2019 – June 2021 |
27 |
Enhancement of
Transportation
Management Software (E-
TraMS) |
UP-NCTS and UP-DCS |
January 2020 –
December 2022 |
28 |
Port Capacity Analysis and
Route Optimization for
Local Maritime
Administration (PAROLA) |
UP-NCTS and UP-DCS |
January 2021 –
December 2021 |
29 |
Conduct of Network Planning for the Establishment of Bike Lanes in Selected LGUs in Metro Manila, Metro Cebu and Metro Davao |
UP-NCTS for UNDP / Department of Transportation (through UPNCTSFI) |
June 2021 – August 2022 |
30 |
Sustaining Actions for Enhanced Child Road Traffic Injury Data, Local Government Advocacy and Safe Journeys of Children in Selected Pilot Sites in the Philippines |
UP-NCTS for UNICEF (through UPNCTSFI) |
March 2021 – present |
31 |
Maritime Energy Demand
Information and Analysis
System (MEDIANS) |
UP-NCTS and UP-DCS for DOST-PCIEERD |
January 2022 –
December 2022 |
32 |
V2X Initiatives for Road
Safety (VIROS) Project
under the Philippine Road
Safety Initiatives
(PROSAFETI) Program |
UP-NCTS, UP-DCS and DOST-ASTIfor DOST-PCIEERD |
March 2022 –
Present |
33 |
Collection, Recording, and
Analysis of Traffic
Incidence Data (CREATE)
Project under the
Philippine Road Safety
Initiatives (PROSAFETI)
Program |
UP-NCTS and UP-DCS for DOST-PCIEERD |
April 2022 –
Present |